HOUSING RESEARCH · 2026

Unlocking Affordable Housing Production in the DMV

A practical path to lower development costs, reduce local funding gaps, and deliver more attainable homes.

Conceptual tree-lined rental neighborhood with single-story homes, individual entrances, and sidewalks
ANOTHER WAY TO BUILDConceptual streetscape from the white paper.
175

Homes in the modeled Case Study

A mix of one- to four-bedroom rentals
$270K

Modeled complete cost per home

$270,469, including land, financing, and reserves
300+

Separate homes in predevelopment

With development partners; local approvals still required

01 / THE OPPORTUNITY

More attainable homes begin with what they cost to build.

Restricted rents limit what affordable housing can finance. When development costs rise, counties are asked to fill the gap. This research examines a different starting point: lowering the complete cost of delivery.

~$95,000

in requested local support per home

Six selected 2025 Northern Virginia LIHTC applications averaged $94,790 per home in identified local support, giving each application equal weight.

The proposed model combines modern factory-built homes, federal 4% Low-Income Housing Tax Credit financing, and zoning that allows a unified, professionally managed rental community.

Explore the financing problem

COMPLETE DEVELOPMENT COST PER HOME

Northern Virginia application sample$510,989
29 new-construction 4% LIHTC application records, 2022–2026
175-home Case Study$270,469
Modeled complete cost in February 2028 dollars

47%lower modeled cost per home
than the application average

An illustrative comparison, not a controlled construction-cost study. Sites, dates, building forms, and requirements differ. The entire difference cannot be attributed to factory construction. Methods: Appendix E ↗

02 / THE CASE STUDY

A complete community.
A different cost structure.

A proposed 175-home community on a real, anonymized site in the Washington-area HUD income-limit region. The model balances the development budget without additional local or state gap funding.

$47.33Mmodeled complete development budget
60% AMIBlended modeled affordability
95 homesWith three or four bedrooms
$0Additional local or state gap funding in the model

Federal tax-credit equity remains essential. No property-tax abatement is assumed. Costs, income, financing, and approvals remain project-specific.

Modeled permanent capital sources
Senior mortgage$31,003,150
Federal LIHTC equity$12,980,242
Deferred developer fee$2,000,000
Interim operating income$1,347,422
Residual sponsor cash$1,298
Total sources$47,332,112

The residual sponsor-cash line is a permanent-financing balance, not the upfront cash requirement. Approximately $1.67 million of predevelopment equity and construction bridge financing are also required.

Read the financial case study, pp. 6–9

03 / THE HOMES & NEIGHBORHOODS

Familiar neighborhood character.
New possibilities for delivery.

Single-story homes with individual entrances, shared outdoor space, and professional management. The paper explores how duplexes, quadplexes, and selected detached homes can work together.

WHO COULD THIS SERVE?

Room for working households at different stages of life.

The paper examines one- and two-income households, young professionals, families, and older adults. Eligibility depends on actual household size, countable income, and the applicable local limits—not occupation.

Households, incomes & rents

04 / A PATHWAY FOR COUNTIES

Make room for the model.

The paper calls for a predictable zoning pathway in suitable districts, allowing qualifying factory-built homes to operate together as one commonly owned rental community.

  1. 01

    Bring the right staff together

    Coordinate housing, planning, zoning, and counsel to review how existing definitions treat HUD-code homes and multifamily rental communities.

  2. 02

    Identify where it can work

    Focus on districts with developable land, sufficient density, utility capacity, road access, and practical connections to jobs and services.

  3. 03

    Clarify the zoning pathway

    Address multiple principal buildings on a common parcel, dwelling-unit density, exterior setbacks, internal separation, and shared infrastructure.

  4. 04

    Keep ordinary safeguards in place

    Retain applicable fire, accessibility, environmental, engineering, and public-safety requirements, with enforceable long-term maintenance responsibilities.

These are the white paper’s recommended review steps. Local counsel and staff must determine the appropriate ordinance language and process for each jurisdiction.

THE PUBLICATION

Start with the summary.
Go deeper into the evidence.

Published October 14, 2026. The full white paper is the authoritative publication; this site provides selected findings and a guide to the research.

THE COMPLETE RESEARCH

Full white paper

Financial analysis, household examples, zoning recommendations, visual concepts, and supporting evidence.

PDF · 57 pages · 5.7 MBRead the full paper Download PDF ↓

A CONVERSATION WORTH STARTING

Will your county be next?

Explore the findings. Share the research. Help establish a clear path for more attainable homes.

Connect with Stefan
Kronenberg Enterprises

Stefan Kronenberg

Founder, Kronenberg Enterprises

The strategy reflects several years of research, financial analysis, product evaluation, and engagement with development and public-sector partners.